Measuring and testing devices
EPP Test Pumps
EPP test pumps are specifically designed for pressure build-up during leak tests of water supply lines and offer maximum reliability in daily use. In combination with the PMS3000 leak testing case, they operate fully automatically and in compliance with standards DVGW W400-2 and SVGW W4. Thanks to the integrated ADAMM pressure relief device with water volume measurement, tests can be carried out efficiently, safely, and without interventions in the pipe trench. The robust piston pump technology, high-quality connections, and protective functions ensure a long service life and maximum operational safety. With a test pressure of up to 25 bar and a flow rate of 14 l/min, the EPP15-14-025 model is ideally suited for professional applications in the water and industrial sectors.
User Benefits
| Vorteil | Beschreibung |
| Automatisierte Steuerung | Vollautomatisch durch den Dichtheitsprüfkoffer PMS3000 gesteuerte Prüfpumpe |
| Normgerechte Prüfabläufe | Komplett automatisierte Prüfabläufe gemäß DVGW W400-2 und SVGW W4 |
| Automatisierter Druckablass (-ADAMM) | Integrierte Druckablassvorrichtung über Magnetventil inkl. Wassermengenmessung – Ausgabe im Prüfprotokoll |
| Vollautomatisierte Dichtheitsprüfung | Durch PMS + ADAMM vollständig ohne manuelle Eingriffe möglich |
| Arbeitssicherheit | Alle Arbeiten außerhalb des Rohrgrabens an zentraler Stelle |
| Robustheit | Langlebige, widerstandsfähige Kolbenpumpentechnik |
Technical data
| Parameter | Wert |
| Modell | EPP15-14-025 |
| Prüfdruck | 0 – 25 bar |
| Fördermenge | 14 l/min |
| Stromversorgung | 230 V / 50 Hz |
| Druckablass-Mengenmessung | 30 l/min |
| Druckregulierung | PMS-gesteuert oder manuell |
| Schutzeinrichtung | Druckschalter im Steuerkreis |
| Wasseranschluss | GEKA-Schnellkupplung |
| Druckanschluss | Schnellkupplung 5010 |
Test kit pms
PMS3000
Pressure test kit for leak testing
EPP test pumps
Pressure test kit for leak testing
ZBK accessory case
Pressure test kit for leak testing
Gas service connection accessory case
Maximum Test Lengths
Maximum test length using the contraction method (for PE
Ø110, SDR11, STP21bar) with optimally vented pipe:
EPP15-14-025
PE Ø110 approx. 1,100 meters
PE Ø160 approx. 520 meters
PE Ø225 approx. 260 meters
PE Ø315 approx. 130 meters
EPP22-30-025
PE Ø110 approx. 2,500 meters
PE Ø160 approx. 1,200 meters
PE Ø225 approx. 600 meters
PE Ø315 approx. 300 meters
EPP40-68-025
PE Ø110 approx. 5,820 meters
PE Ø160 approx. 2,900 meters
PE Ø225 approx. 1,400 meters
PE Ø315 approx. 720 meters
Service
We will answer your questions in the administrative and commercial area.
+49 721 680381-30
Support
For technical support for your product, you can open a support ticket.
Or open a ticket directly via Whatsapp:
+49 171 62122-72
Sales
The sales department is your central contact for product inquiries and quotation preparation.
+49 721 680381-20
Downloads
Here you will find various downloads to support you.
Brochures, data sheets and application reports – we have all the relevant information for you here.
Blog
News from the UNION world.
Lots of news from the world of measurement technology.
Products
Special products for your industrial application.
Our range includes CWD calorimeter devices, INCA analyzers, ESS devices and much more.